12:07 PM
Bid 25: Res. PB Sample for report
Bid Item Order Quantity Report by Location ‑ Loc. Sort w/Hours‑Detail
Item
Code
Description
Unit
Bid
Quantity
Cost
Type #
Description
Order
Quantity
Total
Cost
Unit
Cost Type
Approx.
 Unit Cost
# 6 CONCRETE‑FOUNDATION
CY
122.21
Mat
Lab
 3.001300
15X18 Footing
250.00
LF
Material
Labor
516.00
6.25
HR
30,554.73
CY
1.34
Mat
Lab
 3.002500
Conc Slab 4''
1,500.00
SF
Material
Labor
19.00
30.00
HR
2,021.15
CY
1.07
Mat
 3.003000
Fill Dirt Below Slab Sub
15.00
CF
Material
1.00
16.05
LF
10.70
Mat
 3.003500
Concrete Steps   Sub‑Bid
35.00
LF
Material
35.00
374.50
Sub
 3.004800
Sand & Wire      Sub‑Bid
2.00
SF
Subcontract
2.00
SF
0.74
0.37
Sub
 3.030100
6X6 10/10 Wire Mesh
5.00
SF
Subcontract
1.00
RL
56.70
11.34
PC
0.10
Mat
 3.031100
# 3 (3)Per Run‑Rebar
150.00
LF
Material
26.00
15.75
# 6 CONCRETE‑FOUNDATION =
33,039.62
Labor‑Hours
36.25
Equip‑Hours
Subcont‑Hours
Other‑Hours
# 15 PLASTERING
Sub
 9.000300
Stucco Std.Fin. 9'High
250.00
LF
Subcontract
250.00
YD
4,725.00
18.90
# 15 PLASTERING =
4,725.00
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
# 16 DRYWALL
Sub
 9.010700
1/2Drywall  8'H Intwall
175.00
LF
Subcontract
1,400.00
SF
808.50
4.62
# 16 DRYWALL =
808.50
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
# 17 WINDOWS‑SLIDING DOOR
EA
267.50
Mat
 8.001700
Door‑Ext 3‑0X6‑8 Df 4Pan
1.00
EA
Material
1.00
267.50
1
80.25
Mat
 8.010500
Door 2‑6 Pre‑Fit H/C
3.00
HB
Material
3.00
240.75
EA
192.60
Mat
 8.034300
Door‑Fold  6‑0X8‑0    Hb
2.00
EA
Material
2.00
385.20
# 17 WINDOWS‑SLIDING DOOR =
893.45
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
Your tag line or anything or nothing here
Estimated By
Your Phone
Your Email
.
Any Company
1234 Any Street
Any City, ST 14526
Page 2 of 2
11/03/2016
12:07 PM
Bid 25: Res. PB Sample for report
Bid Item Order Quantity Report by Location ‑ Loc. Sort w/Hours‑Detail
Item
Code
Description
Unit
Bid
Quantity
Cost
Type #
Description
Order
Quantity
Total
Cost
Unit
Cost Type
Approx.
 Unit Cost
# 31 INSULATION
Sub
 7.023400
R‑19 Walls
2,500.00
SF
Subcontract
2,500.00
SF
918.75
0.36
Sub
 7.023700
R‑19 Ceil. Batts
1,500.00
SF
Subcontract
1,500.00
SF
551.25
0.36
# 31 INSULATION =
1,470.00
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
Total of Shown Bid Items *ONLY*
40,936.57
Labor‑Hours
36.25
Equip‑Hours
Subcont‑Hours
Other‑Hours